.JPG) After-party (SMC Karaoke) |
_2.JPG) After-party (SMC Karaoke) |
.JPG) AVR & Panel board (1,000m) |
.JPG) AVR setting (1,000m, Sangdong Drive) |
 Completion of core classification |
.JPG) Developing work in progress (Taeback Level) |
.JPG) Developing work in progress (Taebaek Level) |
.JPG) Drilltech Drilling in progress (1,000m Sangdong Drive) |
.JPG) Electricity wiring for A.V.R construction (1,000m, Sangdong Drive) |
 Excavating work at Woulfe adit |
 Lucky draw with SMC |
.JPG) Moving core trays to ungerground (Battery Charge Room) |
.JPG) Omya garage |
 Open field for SMC parking lot |
 Opening by CEO's message 2011 |
.JPG) Panel board on Sangdong Drive (1,400m) |
 Preparation for core frames near vertical shaft |
 Removal of Omya garage |
_after.JPG) Removal of pole (Geology office) after |
_before.JPG) Removal of pole (Geology office) before |
 Removal of Transformer used by Omya |
 SMC Awards_Employee of the year 2011 |
 SMC Awards_Mr.SMC |
 SMC Dine in Taebaek |
 SMC Host_DJ&SH CHO |
 SMC Parking lot |
 SMC Photo shoot after year-end party |
 SMC Quiz time_Recreation |
.JPG) SMC storage container (Consumables & Maintenance supplies) |
 SMC Year-end party 2011 |
 SMC Year-end party 2011 |
.JPG) Starting developing work (Taeback Level) |
|
|
 Cleaning up on Taebaek Level in progress |
 Crushing work |
 Line up in the Yeongwol stadium |
.JPG) Open bidding for electricity works from 700m to 1200m on Sangdong drive (site visit by contractors) |
 Operation on Taeback Level |
 Pile of rockfalls on Taebaek Level |
.JPG) Preparation for 2nd bulk sample testing (Main) |
 Propping works on Taebaek Level |
 SMC attending the event of Yeongwol County Resident's Day |
 SMC marching with pride 'SMC, driving force of economic growth in Yeongwol county' |
 Stacking up rockfalls on Taebaek Level |
 Taeback Level |
 Taeback Level |
.JPG) The 1st signpost to SMC head office (entrance of the Kkoldu rock) |
 The 2nd signpost to SMC head office |
 The last signpost to SMC |
 Transporting rocks on Taebaek Level |
 Completion of unloading crusher set |
 Demolition of old warehouse |
 Developing and cleaning work on Taebaek |
 Dumping collected rocks |
 New core lab installation after removal of decrepit warehouse |
 Repairing the mine car abandoned on Taebaek Level |
 Shipment arriving three open flat rack contrainers |
 Unloading feeder by 50 tons crane |
 Checking on unstable area for blasting |
 Framework completion in Omya construction |
 Meeting & discussion for mining plan(Wardrop, SMC Advisors, Geo Team) |
 Meeting for mining plan1(Wardrop,SMC Advisors,Geo Team) |
 Underground visit on Level 1 |
 Met-test sampe preparation |
 New core storage |
 New core storage |
 Bulk sample prepartion |
 Geotech drilling for plant site |
 Geotech drilling for plant site |
 Bulk sample preparation |
 Bulk sample preparation |
 Drilling on Taebaek |
 'Kkoldu Rock Festival' Sangdong Village Festival (encouraged by Head of Yeongwol County and Sangdong Town Office) |
 Appreciation Plaque awarded by Sangdong Town Committee |
 Attending the Festival (SMC employees) |
 Sample Preparation for Met-Testing (FW of Sangdong Drive, extract from rockfalls) |
 Rock Bolting on Sangdong Drive |
 Coreshed Framework & Installation |
 Propping Works at Dangerous Area on Level 1 (RR)_2 |
 Propping Works at Dangerous Area on Level 1 (RR)_3 |
 Developing in access to Sangdong and RR(After) |
 Developing in access to Sangdong and RR(Before) |
 Developing & Removing debris on 1RR (After) |
 Developing on 1RR (Connecting path Sangdong to Level 1) |
 Ground Pressure after Rock Bolting |
 Propping works on Sangdong Level |
 Rock Bolting on Taebaek |
 Cracks on the Ceiling |
 After Rockfalls on Level 1 |
 Before Rockfalls on Level 1 |
 Propping works at Sangdong 340m |
 Rock Bolting on Taebaek Level |
 Developing work on Level 1 under the Stairways of Vertical Shaft (After) |
 Developing work on Level 1(Before) |
 Developing work on Level 1(After) |
 Excavating Work at Woulfe adit |