Propping works at Sangdong 340m


Rock Bolting on Taebaek Level


Developing work on Level 1 under the Stairways of Vertical Shaft (After)


Developing work on Level 1(Before)


Developing work on Level 1(After)


Excavating Work at Woulfe adit


Grounding work at the front of container House


Completion of Developing


Developing in 5 RR


Developing in 6 RR (ventilation)


Removal of Scats on Level 1


Explosive Storage 3


Drainage on Level 1 and Cleaning


Explosive Storage 1


Explosive Storage 2


Developing on Level 1 to portal of 3RR


Sangdong Sports Day_Foot Volleyball Match with Sangdong Town Office


Sangdong Sports Day_Hospitality for Elderly People in Sangdong Town


Sangdong Sports Day_Foot Volleyball Match (SMC)


CPR demostration


Visit to drilling site (Taebaek Level)


Kurt Wandaller, Senior VP Head of Business Unit TMR, Dr.Joern Vogt, Senior VP Procument, Dr.Christian Gerk, Director Product Management & Engineering


UV on cutting core taken from Sangdong phase 2 drilling


Visit to geology office


Arranging rail cars taken out from Sangdong drive


CPR instruction by AV education


Excavating work at Woulfe adit


Last point at west-end (Sangdong to Ventil)


Rock drill machine orientation (Furakawa 322D, Toyo24)


Cutting trees at prospective Woulfe adit site (after)


Cutting trees at prospective Woulfe adit site (before)


Distance mark (Sangdong to Ventilation)


Memorial service and prayer for successful revelopment


Training with rock drill machine


Cleaning in progress on Sangdong level (850m)


Underground rock bolting training


Vulcan Training Session by Iaonnis


Kempe drilling at 1,200m Level 1 progressing - currently at 40m depth


Rock bolting testwork done in Level 1


Sangdong Level now cleared up to 510m


1st Sangdong adit


First trip inside the mine in 20 years


Looking towards new primary crushing area


Looking towards new primary crushing area


Looking towards new primary crushing area


Looking towards new primary crushing area


Proposed new milling area


Proposed site for new primary crusher


Site accommodation


Building to be restored as museum for local area


Existing building undergoing refurbishment to provide initial site offices


Existing building undergoing refurbishment to provide initial site offices


Looking up towards new proposed primary crushing area


Site for new headframe at top of existing shaft cap


Area for new processing plant


Area for new processing plant


Area for new processing plant


Area for new processing plant


Area for new processing plant


Area for proposed new thickeners


Old APT plant area is also site for new processing plant


Old APT plant area to make way for new processing plant


View showing some of the old structures


Welcome banners entrance to Sangdong Town